PROVIDING ELECTRICITY UNDER GROUND

The underground got its electricity from cables arriving from the power plant on Kertész Street. Various groups of machines were set up for the underground. In the tunnel, electricity was run through work cables, built in the ceiling structure above the tracks. Following the tunnel’s pathway, different cables of the lighting system, power lines, and cables for the automated traffic controlling devices were laid down.